Running event in Hong Kong requiring a low noise and sustainable power solution to align with the organiser and sponsor's brand images.
Low noise and low polution alternative to diesel generators required to power the weekend running event.
We addressed the power challenge by proposing a small grid connection for continuous charging as the client's initial suggestion of a midnight small grid charging was ruled out. We also maintained SoC monitoring throughout the event.
Four Ampd Enertainer units were successfully deployed at various locations to support the 10K, 5K, and 3K run events over the weekend.
The existing available grid capacity was utilized for continuous charging, with state-of-charge (SoC) monitored for the entire duration of the event.
Both the event organizer and their electrical and mechanical (E&M) contractor expressed their satisfaction with the power and energy proposal, on-site technical support, and Enernet IoT monitoring system.
Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.