Ampd Powered Theme Park Running Event

Detalhes do projeto

Location

Lantau Island, Hong Kong

Main Contractor

TBC

Project Type

Weekend running event

Country

HK

85%

CO2 reduction

30x

quieter than a diesel generator

100%

reliability. Provided stable power supply for the event.

Zero

air quality pollutants leading to a better event environment

Contexto

Running event in Hong Kong requiring a low noise and sustainable power solution to align with the organiser and sponsor's brand images.

saiba mais

Desafio

saiba mais

A Solução

saiba mais

O Resultado

Four Ampd Enertainer units were successfully deployed at various locations to support the 10K, 5K, and 3K run events over the weekend.
The existing available grid capacity was utilized for continuous charging, with state-of-charge (SoC) monitored for the entire duration of the event.
Both the event organizer and their electrical and mechanical (E&M) contractor expressed their satisfaction with the power and energy proposal, on-site technical support, and Enernet IoT monitoring system.