Zero Emission Energy for Urbanisation (AMC)

Project details

Location

Advanced Manufacturing Centre, Hong Kong

Main Contractor

Gammon Construction (Hong Kong)

Project Type

Superstructure (108,000 m² building) + footbridge + seawater district cooling system

Country

HK

78%

lower OPEX 1 (vs. a 350/400 kVA generator)

81%

CO2 reduction (vs. a 350/400 kVA generator)2

99.99%

uptime3

Zero

maintenance downtime3

1Assuming a wholesale market diesel price of HK$5.50 (US$0.71 per litre).

Background

Further information about this project will be available soon. Please check back for updates.

learn more

Challenge

Further information about this project will be available soon. Please check back for updates.

learn more

The Solution

Further information about this project will be available soon. Please check back for updates.

learn more

The Result

Further information about this project will be available soon. Please check back for updates.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

DOWNLOAD

"From a site perspective, the Enertainer was a great fit for AMC. We put it through its paces and it responded to everything we threw at it. It was very simple to set up and operate with almost no downtime to site operations. We’re particularly excited about the lower noise levels which will really help us get government approval to continue working at noise-sensitive hours."

Sammy Lai
Director, Building Projects, Gammon Construction