Zero Emission Energy for Urbanisation (AMC)

專案詳情

Location

Advanced Manufacturing Centre, Hong Kong

Main Contractor

Gammon Construction (Hong Kong)

Project Type

Superstructure (108,000 m² building) + footbridge + seawater district cooling system

Country

HK

78%

lower OPEX 1 (vs. a 350/400 kVA generator)

81%

CO2 reduction (vs. a 350/400 kVA generator)2

99.99%

uptime3

Zero

maintenance downtime3

背景

Further information about this project will be available soon. Please check back for updates.

了解更多

挑戰

Further information about this project will be available soon. Please check back for updates.

了解更多

解決方案

Further information about this project will be available soon. Please check back for updates.

了解更多

成果

Further information about this project will be available soon. Please check back for updates.

下載案例研究

了解我們的 Enertainers 如何在保護環境並降低成本的同時,提升營運效率。

下載

"From a site perspective, the Enertainer was a great fit for AMC. We put it through its paces and it responded to everything we threw at it. It was very simple to set up and operate with almost no downtime to site operations. We’re particularly excited about the lower noise levels which will really help us get government approval to continue working at noise-sensitive hours."

Sammy Lai
Director, Building Projects, Gammon Construction