Sustainable Power Solution for Eon Event at M+ Museum

Project details

Location

West Kowloon Cultural Sistrict

Main Contractor

TBC

Project Type

One-night internal event

Country

HK

18.62x

less loud. Sound power reduced from 96 dB to 83.3 dB.

67%

CO2 reduction

100%

reliability. Provided stable power supply for the event.

Background

Further information about this project will be available soon. Please check back for updates.

learn more

Challenge

Further information about this project will be available soon. Please check back for updates.

learn more

The Solution

Further information about this project will be available soon. Please check back for updates.

learn more

The Result

Further information about this project will be available soon. Please check back for updates.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

DOWNLOAD

“To meet the power demands of the event, we deployed two Silo M units to ensure a robust supply. Not only did the Silo eliminated the risk of power outages and fluctuations, but also resulted in a significant reduction in both noise and air pollution by replacing two diesel generators. This discreet and environmentally friendly power solution was essential considering the cultural significance of the event location, and aligned with Eon’s and M+ Museum’s commitment to sustainability.”