Sustainable Power Solution for Eon Event at M+ Museum

West Kowloon Cultural District

Location

Contractor

Project Type

Location

West Kowloon Cultural Sistrict

Project Type

One-night internal event

Main Contractor

Background

Introduction & Project Information

  • Delivery date: 12 May 2025
  • Loads: Cooking tools, lights, Karaoke
  • ESS Model: Silo M x 2
  • Input current to the ESS: ~32 amps
18.62x

less loud. Sound power reduced from 96 dB to 83.3 dB.

67%

CO2 reduction

100%

reliability. Provided stable power supply for the event.

The Solution

Results

“To meet the power demands of the event, we deployed two Silo M units to ensure a robust supply. Not only did the Silo eliminated the risk of power outages and fluctuations, but also resulted in a significant reduction in both noise and air pollution by replacing two diesel generators. This discreet and environmentally friendly power solution was essential considering the cultural significance of the event location, and aligned with Eon’s and M+ Museum’s commitment to sustainability.”

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.