Sustainable Power Solution for Eon Event at M+ Museum

專案詳情

Location

West Kowloon Cultural Sistrict

Main Contractor

TBC

Project Type

One-night internal event

Country

HK

18.62x

less loud. Sound power reduced from 96 dB to 83.3 dB.

67%

CO2 reduction

100%

reliability. Provided stable power supply for the event.

背景

Further information about this project will be available soon. Please check back for updates.

了解更多

挑戰

Further information about this project will be available soon. Please check back for updates.

了解更多

解決方案

Further information about this project will be available soon. Please check back for updates.

了解更多

成果

Further information about this project will be available soon. Please check back for updates.

下載案例研究

了解我們的 Enertainers 如何在保護環境並降低成本的同時,提升營運效率。

下載

“To meet the power demands of the event, we deployed two Silo M units to ensure a robust supply. Not only did the Silo eliminated the risk of power outages and fluctuations, but also resulted in a significant reduction in both noise and air pollution by replacing two diesel generators. This discreet and environmentally friendly power solution was essential considering the cultural significance of the event location, and aligned with Eon’s and M+ Museum’s commitment to sustainability.”