HKU Student Residence, Supporting Modular Construction

Project details

Location

Police School Road, Wong Chuk Hang

Main Contractor

Paul Y. Engineering Group

Project Type

MiC Student Residence

Country

HK

88%

lower operating cost 1 (vs. 500 kVA generators)

66%

CO2 reduction2 (vs. 500 kVA generators)

760,550 kWh (87%)

energy saving per year

18,250 kWh

per year saved through Auto Sleep Mode*

1Assuming a diesel price of HK$9.0 per litre.

Background

Further information about this project will be available soon. Please check back for updates.

learn more

Challenge

Further information about this project will be available soon. Please check back for updates.

learn more

The Solution

Further information about this project will be available soon. Please check back for updates.

learn more

The Result

Further information about this project will be available soon. Please check back for updates.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

DOWNLOAD

"Since this was one of the pilot projects adopting the Modular Integrated Construction (MiC) method, we had to use one of the strongest tower cranes (64T Liebherr 710HC-L 32/64) available in Hong Kong. The project was to build two 17-floor towers that accommodate students, management staff, as well as other facilities. Not only did the Enertainer help reduce carbon emissions and operating costs, but it also helped us save more energy with Auto Sleep Mode, which automatically turns the power off when not needed. The result was impressive and it strengthened our confidence in deploying more Enertainers at our sites."

Mr. Eddie Yeung
Director and General Manager, Paul Y. Engineering Group