HKU Student Residence, Supporting Modular Construction

Police School Road, Wong Chuk Hang

Location

Contractor

Project Type

Location

Police School Road, Wong Chuk Hang

Project Type

Project Type

Main Contractor

Main Contractor

Background

Introduction & Project Information

Location
66%
760,550 kWh (87%)
18,250 kWh

The Solution

Results

"Since this was one of the pilot projects adopting the Modular Integrated Construction (MiC) method, we had to use one of the strongest tower cranes (64T Liebherr 710HC-L 32/64) available in Hong Kong. The project was to build two 17-floor towers that accommodate students, management staff, as well as other facilities. Not only did the Enertainer help reduce carbon emissions and operating costs, but it also helped us save more energy with Auto Sleep Mode, which automatically turns the power off when not needed. The result was impressive and it strengthened our confidence in deploying more Enertainers at our sites."

Mr. Eddie Yeung
Director and General Manager, Paul Y. Engineering Group

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.