A Fully Electrified Construction Site

Project details

Location

Ho Man Tin, Hong Kong

Main Contractor

China Overseas Building Construction Ltd.

Project Type

Residential Development

Country

HK

99.99%

uptime throughout the project period

85%

CO2 reduction (vs. 350 kVA generators)2

190 amps

highest current measured

Zero

air quality pollutants leading to a better working environment

1Assuming a CO2 emission intensity of 0.39 kg per kWh (Source: CLP Sustainability Report 2021)

Background

Further information about this project will be available soon. Please check back for updates.

learn more

Challenge

Further information about this project will be available soon. Please check back for updates.

learn more

The Solution

Further information about this project will be available soon. Please check back for updates.

learn more

The Result

Further information about this project will be available soon. Please check back for updates.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

DOWNLOAD

"We are very excited to see an 85% reduction in carbon emissions and zero downtime during our project. Since the project is so close to residential areas, the Enertainer was integral to keeping air and noise pollution to a minimum. We were also impressed by Ampd’s support in developing an accessory that helped us install the unit in a tight area. We will be deploying more Enertainers at our sites and are looking forward to seeing what Ampd comes up with next."

China Overseas Building Construction Ltd.