A Fully Electrified Construction Site

專案詳情

Location

Ho Man Tin, Hong Kong

Main Contractor

China Overseas Building Construction Ltd.

Project Type

Residential Development

Country

HK

99.99%

uptime throughout the project period

85% (1)

CO2 reduction (vs. 350 kVA generators)2

190 amps

highest current measured

0

air quality pollutants leading to a better working environment

背景

Further information about this project will be available soon. Please check back for updates.

了解更多

挑戰

Further information about this project will be available soon. Please check back for updates.

了解更多

解決方案

Further information about this project will be available soon. Please check back for updates.

了解更多

成果

Further information about this project will be available soon. Please check back for updates.

下載案例研究

了解我們的 Enertainers 如何在保護環境並降低成本的同時,提升營運效率。

下載

"We are very excited to see an 85% reduction in carbon emissions and zero downtime during our project. Since the project is so close to residential areas, the Enertainer was integral to keeping air and noise pollution to a minimum. We were also impressed by Ampd’s support in developing an accessory that helped us install the unit in a tight area. We will be deploying more Enertainers at our sites and are looking forward to seeing what Ampd comes up with next."

China Overseas Building Construction Ltd.