ESS for The Grove - Mixed Use Development Project

Project details

Location

Abu Dhabi, UAE

Main Contractor

TBC

Project Type

Construction of substructure & superstructure works

Country

UAE

713 tonnes

CO2 reduction per year1 (57% reduction)

22,500 L

fuel saved per month2

AED 726K yearly savings

in operating cost3 (54% reduction)

1Assuming a CO2 emission intensity of 2.64 kg per litre.

Background

Further information about this project will be available soon. Please check back for updates.

learn more

Challenge

Further information about this project will be available soon. Please check back for updates.

learn more

The Solution

Further information about this project will be available soon. Please check back for updates.

learn more

The Result

Further information about this project will be available soon. Please check back for updates.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

DOWNLOAD

“We are proud to partner with Aldar Properties PJSC to utilize our ESS solution to power construction equipment. The system not only eliminated emissions, reduced noise, and lowered operational costs in challenging environments but also aligned seamlessly with Aldar's commitment to creating a greener, more resilient future. This collaboration marks a significant step forward in revolutionizing construction sites with innovative solutions that enhance efficiency, safety, and sustainability.”

Rafat Awad, Head of Sales GCC Ampd Energy