ESS for The Grove - Mixed Use Development Project

Abu Dhabi, UAE

Location

Contractor

Project Type

Location

Abu Dhabi, UAE

Project Type

Construction of substructure & superstructure works

Main Contractor

Background

Introduction & Project Information

  • Developer: Aldar Properties PJSC
  • Delivery datmese: Nov 2024
  • Loads: 2 Tower cranes & constant load from construction tools
  • Enertainer Model: Enertainer L+
  • Input current to the Enertainer: 80 amps

713 tonnes

CO2 reduction per year1 (57% reduction)

22,500 L

fuel saved per month2

AED 726K yearly savings

in operating cost3 (54% reduction)

1Assuming a CO2 emission intensity of 2.64 kg per litre.

2Assuming a diesel price of AED 2.5 per litre.

3Fuel consumption and rental costs of both Enertainer and Diesel Generators provided by Aldar Properties PJSC.

The Solution

Results

“We are proud to partner with Aldar Properties PJSC to utilize our ESS solution to power construction equipment. The system not only eliminated emissions, reduced noise, and lowered operational costs in challenging environments but also aligned seamlessly with Aldar's commitment to creating a greener, more resilient future. This collaboration marks a significant step forward in revolutionizing construction sites with innovative solutions that enhance efficiency, safety, and sustainability.”

Rafat Awad, Head of Sales GCC Ampd Energy

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.