ESS for The Grove - Mixed Use Development Project

專案詳情

Location

Abu Dhabi, UAE

Main Contractor

TBC

Project Type

Construction of substructure & superstructure works

Country

UAE

713 tonnes

CO2 reduction per year1 (57% reduction)

22,500 L

fuel saved per month2

AED 726K yearly savings

in operating cost3 (54% reduction)

1Assuming a CO2 emission intensity of 2.64 kg per litre.

‍

背景

Further information about this project will be available soon. Please check back for updates.

了解更多

挑戰

Further information about this project will be available soon. Please check back for updates.

了解更多

解決方案

Further information about this project will be available soon. Please check back for updates.

了解更多

成果

Further information about this project will be available soon. Please check back for updates.

下載案例研究

了解我們的 Enertainers 如何在保護環境並降低成本的同時,提升營運效率。

下載

“We are proud to partner with Aldar Properties PJSC to utilize our ESS solution to power construction equipment. The system not only eliminated emissions, reduced noise, and lowered operational costs in challenging environments but also aligned seamlessly with Aldar's commitment to creating a greener, more resilient future. This collaboration marks a significant step forward in revolutionizing construction sites with innovative solutions that enhance efficiency, safety, and sustainability.”

Rafat Awad, Head of Sales GCC Ampd Energy