Enertainer for Sobha Hartland II Residential Project

Bu kadra, Ras al khor

Location

Contractor

Project Type

Location

Bu kadra, Ras al khor, United Arab Emirates

Project Type

Construction

Main Contractor

Sobha Constructions

Background

Introduction & Project Information

  • Delivery date: Nov 2024
  • Loads: 4 Tower cranes
  • Enertainer Model: Enertainer M+
  • Input current to the Enertainer: 70 amps

354 tonnes

CO2 reduction per year1 (72% reduction) (vs. 2 X 350 kVA generator)

AED 330,982 yearly savings

in operating cost2 (72% reduction)

1Assuming a CO2 emission intensity of 2.64 kg per litre.

2Fuel consumption and rental costs of both Enertainer and Diesel Generators were provided by Sobha.

The Solution

Results

“By adopting our innovative energy storage system, Sobha have significantly reduced their carbon footprint and operational costs, contributing to broader efforts to minimize emissions and improve resource efficiency. Sobha’s collaboration underscores our dedication to integrating sustainable technologies across heavy industries and achieving meaningful progress toward carbon reduction.”

Rafat Awad, Head of Sales GCC Ampd Energy

Download Case Study