Enertainer for Sobha Hartland II Residential Project

專案詳情

Location

Bu kadra, Ras al khor, United Arab Emirates

Main Contractor

Sobha Constructions

Project Type

Construction

Country

UAE

354 tonnes

CO2 reduction per year1 (72% reduction) (vs. 2 X 350 kVA generator)

AED 330,982 yearly savings

in operating cost2 (72% reduction)

1Assuming a CO2 emission intensity of 2.64 kg per litre.

背景

Further information about this project will be available soon. Please check back for updates.

了解更多

挑戰

Further information about this project will be available soon. Please check back for updates.

了解更多

解決方案

Further information about this project will be available soon. Please check back for updates.

了解更多

成果

Further information about this project will be available soon. Please check back for updates.

下載案例研究

了解我們的 Enertainers 如何在保護環境並降低成本的同時,提升營運效率。

下載

“By adopting our innovative energy storage system, Sobha have significantly reduced their carbon footprint and operational costs, contributing to broader efforts to minimize emissions and improve resource efficiency. Sobha’s collaboration underscores our dedication to integrating sustainable technologies across heavy industries and achieving meaningful progress toward carbon reduction.”

Rafat Awad, Head of Sales GCC Ampd Energy