Cutting Carbon Emissions and Costs with Ampd Enertainer in Indonesia

Gresik, East Java, Indonesia

Location

Contractor

Project Type

Location

Gresik, East Java, Indonesia

Project Type

Office and Warehouse

Main Contractor

Joint Operation - PT ADHI Karya Tbk & PT WIKA Gedung Tbk

Background

Introduction & Project Information

  • Developer: Java Integrated Industrial and Port Estate (JIIPE)
  • Delivery date: 2 December 2024
  • Loads: 3 Tower Cranes, 1 Site office
  • Enertainer Model: Enertainer L+
  • Input current to the Enertainer: ~50 amps
99.9%

uptime throughout the project period

59%

CO2 reduction (vs.2 x 300 kVA DG , 1 x 220 kVA DG)

260.1 amps

highest current measured

Nearly 0

air quality pollutants leading to a better working environment

1Assuming a CO2 emission intensity of 2.64 kg per Liter

The Solution

Results

“We are very excited to see 59% reduction in carbon emissions and 38% OPEX savings. We are proud to be one of the pioneers in Indonesia adopting battery storage system in our construction work. The Enertainer was integral to keeping air and noise pollution to a minimum. We will be deploying more Enertainers at our sites and are looking forward to seeing what Ampd comes up with next.”

Mr Sola Christy
Procurement, Joint Operation PT ADHI Karya Tbk - PT WIKA Gedung Tbk

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.