Cutting Carbon Emissions and Costs with Ampd Entertainer in Indonesia

專案詳情

Location

Gresik, East Java, Indonesia

Main Contractor

Joint Operation - PT ADHI Karya Tbk & PT WIKA Gedung Tbk

Project Type

Office and Warehouse

Country

ID

99.9%

uptime throughout the project period

59%

CO2 reduction (vs.2 x 300 kVA DG , 1 x 220 kVA DG)

260.1 amps

highest current measured

Nearly 0

air quality pollutants leading to a better working environment

1Assuming a CO2 emission intensity of 2.64 kg per Liter

背景

Further information about this project will be available soon. Please check back for updates.

了解更多

挑戰

Further information about this project will be available soon. Please check back for updates.

了解更多

解決方案

Further information about this project will be available soon. Please check back for updates.

了解更多

成果

Further information about this project will be available soon. Please check back for updates.

下載案例研究

了解我們的 Enertainers 如何在保護環境並降低成本的同時,提升營運效率。

下載

“We are very excited to see 59% reduction in carbon emissions and 38% OPEX savings. We are proud to be one of the pioneers in Indonesia adopting battery storage system in our construction work. The Enertainer was integral to keeping air and noise pollution to a minimum. We will be deploying more Enertainers at our sites and are looking forward to seeing what Ampd comes up with next.”

Mr Sola Christy
Procurement, Joint Operation PT ADHI Karya Tbk - PT WIKA Gedung Tbk