Zero-Emission Power for Inner City Residential Development

Rochdale Road, Manchester

Location

Contractor

Project Type

Location

Rochdale Road, Manchester

Project Type

Residential Development

Main Contractor

Background

Introduction & Project Information

  • Delivery date: July 2024
  • Loads: 2 Tower Cranes & 2 Hoists
  • ESS Model: Enertainer M
  • Input current to the ESS: 30 amps
615 tons CO₂

reduction over 60 weeks1

302k litres diesel

reduction over 60 weeks1

£7,688

peak 7-day diesel cost saving2

1,120 kVA

diesel generator capacity removed (vs 500 + 300 + 2×160 kVA)

1Assuming a CO2 emission intensity of 2.64 kg per litre.

2At peak load and assuming a diesel price of £1.40 per litre.

The Solution

Results

“Working with the Ampd Entertainer is like a one-stop solution. It has negated copious amounts of generators we would have had to hire as a result of operating two tower cranes, two hoists and the temporary electric supplies for all the four blocks. Operationally we've not had to have the wagons on the road or at the gate, which has reduced our gate time and nuisance factor with the local residents. All in all, its had a massive impact in a positive way, particularly for the environment.”

Darrell Cullen
Senior Project Manager, McGoff Construction

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.