Zero-Emission Power for Central Harbourfront

Project details

Location

Central Harbourfront, Hong Kong

Contractor

China Overseas Building Construction Limited

Project Type

Commercial Development

Country

HK

68%

operating cost1 (vs. 3 x 500 kVA Diesel Generator)

945k tonnes

CO2 reduction2,3 (vs. 3 x 500 kVA Diesel Generator)

408k litres

diesel reduction2,3 (vs. 3 x 500 kVA Diesel Generator)

1Assuming a diesel price of HKD$7 per litre and electricity price at HKD$1.56 per kWh.

Background

Further information about this project will be available soon. Please check back for updates.

learn more

Challenge

Further information about this project will be available soon. Please check back for updates.

learn more

The Solution

Further information about this project will be available soon. Please check back for updates.

learn more

The Result

Further information about this project will be available soon. Please check back for updates.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

DOWNLOAD

“As the specialist contractor for the New Central Harbourfront development, we commit to integrate innovative technology which can enhance both efficiency and sustainability. The Ampd Enertainer energy storage system is a step towards realizing these principles — providing a reliable and efficient power source that eliminates the challenges of diesel generators. Its quiet operation significantly reduces noise pollution, creating a better working environment, while helping to abate nearly a million tonnes of CO₂ emissions. We let the Enertainer’s state of charge drop through the week, knowing it will fully recharge over the weekend when operations pause. This strategy allows us to maintain a low charging current (19A) while ensuring it continues to meet the site’s demands. By adopting the Enertainer, we are not only improving operational performance but also reinforcing our commitment to a greener, more sustainable construction.”

Franky Lo
Project Director, Goldwave Steel Structure Engineering Ltd