Powering Two Tower Cranes, Superstructure

Project details

Location

North Point, Hong Kong

Main Contractor

Hip Hing Construction Company Ltd.

Project Type

Superstructure of a 2 million sq. ft., 45-floor building

Country

HK

85%

lower fuel cost1 (vs. 2 X 400 kVA generators)

81%

CO2 reduction2 (vs. 2 X 400 kVA generators)

424 amps

highest current measured

90%+

battery capacity maintained at all times

1Assuming a diesel price of HK$5 (US$0.64 per litre).

Background

Further information about this project will be available soon. Please check back for updates.

learn more

Challenge

Further information about this project will be available soon. Please check back for updates.

learn more

The Solution

Further information about this project will be available soon. Please check back for updates.

learn more

The Result

Further information about this project will be available soon. Please check back for updates.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

DOWNLOAD

"I’ve been looking for a way to reduce our reliance on diesel for a while, so when the chance to use the Ampd Enertainer came along, I was excited. The result delivered beyond the original idea. Not only did it reduce our emissions but also our operational costs and noise. It also proved extremely easy to use, so the project team was very pleased. In addition, we conducted some trials to test the recharging efficiency and the energy storage capacity of the Enertainer. The results exceeded our expectations."

Herman Lee
Senior Manager, Plant and Logistics, Hip Hing