New Application on Site Operation Facility

Project details

Location

Punggol, Singapore

Main Contractor

Kimly Construction Pte Ltd.

Project Type

Educational Institution

Country

SG

SGD$17,000+

OPEX saving per year

53% (200+ tonnes)

CO2 footprint reduction per year2

Zero

maintenance and refueling downtime

Zero

overheating for 24/7 Enertainer operations

1Assuming a diesel price of SGD$1.3 per litre.

Background

Further information about this project will be available soon. Please check back for updates.

learn more

Challenge

Further information about this project will be available soon. Please check back for updates.

learn more

The Solution

Further information about this project will be available soon. Please check back for updates.

learn more

The Result

Further information about this project will be available soon. Please check back for updates.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

DOWNLOAD

"We use a fair amount of energy to support our site offices and dormitory for site workers, and we had to deploy 4 large diesel generators to ensure a stable energy stream. By introducing a unit of Enertainer to replace 2 diesel generators, we were able to achieve reliable electricity supply for 24 hours/7 days operation without worrying about any overheating issues. On top of that, we achieved operational cost savings and more than halved our carbon emissions."

Mr. Roy Khoo
Director, Kimly Construction