The Multi-welfare Services Complex developed by the Architectural Services Department and SOCAM Development is a major project in the Kwu Tung North Development Area. Four Enertainers powered four 64 ton tower cranes at this Modular Integrated Construction site, reducing CO₂ by 61% and saving HKD854,000/yr on diesel fuel cost.
See how we’ve helped some of our customers reduce carbon emissions, noise levels, diesel handling and operating costs while increasing productivity and transparency of their operations.
Get in touch with us now with your site power requirements and we’ll get you started on your transition.
We're on the lookout for smart, talented and passionate people with engineering, business and design backgrounds. Drop us a line if you're interested in energy, startups, batteries, construction and leaving the world a little better than you found it.