Supporting Maintenance Work at a Space Constraint Site

專案詳情

83.3%

Mount Cameron Road, Hong Kong

Main Contractor

China Geo-Engineering Corporation

Project Type

Slope Maintenance Work

Country

HK

83.30%

less exposure to diesel and noise pollution

32 times

quieter than diesel genrator

51%

CO2 reduction (by reducing the operation time of 75 kVA generator)

Zero

on-site air pollutant, improve workers’ and nearby residents’ health

背景

Further information about this project will be available soon. Please check back for updates.

了解更多

挑戰

Further information about this project will be available soon. Please check back for updates.

了解更多

解決方案

Further information about this project will be available soon. Please check back for updates.

了解更多

成果

Further information about this project will be available soon. Please check back for updates.

下載案例研究

了解我們的 Enertainers 如何在保護環境並降低成本的同時,提升營運效率。

下載

"In the past, we constantly received complaints from the neighborhood regarding the disruptive noise and unpleasant smell produced by the 75 kVA diesel generator on site. Ampd, as a BESS expert, came to study the condition of our site and recommended their new product, the Silo, as the solution. Since transitioning to the Silo, we have noticed a significant reduction in both noise and carbon emissions. This not only effectively addressed the concerns raised by the residents but also enhanced the accessibility of our model to remote and hilly areas, thanks to its lightweight and slim design. We genuinely appreciate the positive impacts that Silo has brought."

Mr. German Leung
General Manager (Foundations Department), China Geo-Engineering Corporation