Kai Tak 1E1, Enertainer for Foundation Projects

專案詳情

Location

Kai Tak, Hong Kong

Main Contractor

Tysan Holdings Limited

Project Type

Foundation Residential Development

Country

HK

82%

lower operating cost1 (vs. 200 kVA generators)

75%

CO2 reduction2 (vs. 200 kVA generators)

170 amps

highest current measured

Zero

on-site air pollutant, improve workers health

背景

Further information about this project will be available soon. Please check back for updates.

了解更多

挑戰

Further information about this project will be available soon. Please check back for updates.

了解更多

解決方案

Further information about this project will be available soon. Please check back for updates.

了解更多

成果

Further information about this project will be available soon. Please check back for updates.

下載案例研究

了解我們的 Enertainers 如何在保護環境並降低成本的同時,提升營運效率。

下載

"Tysan is always open to adopting innovative technologies to promote both carbon reduction and site operation optimization. Ampd Enertainer is one of these technologies. It is ideal for ELS works, with significantly less carbon emission and less noise than diesel generators. Its online platform 'Enernet' is imperative in optimizing a smart construction site for us. Not only did it allow us to remotely monitor the system at any time, but it also helped us track carbon savings of our site work."

Mr. Stephen Lam
Senior Project Manager, Tysan Foundation Limited