Zero Emission Energy for Urbanisation (Foundation)

Detalhes do projeto

Location

Central Kowloon Route, Kai Tak West Section (Ma Tau Kok work front)

Main Contractor

Gammon Construction (Hong Kong)

Project Type

Foundation (cut-and-cover tunnel by temporary reclamation)

Country

HK

50%

lower OPEX 1 (vs. a 200/220 kVA generators)

85%

CO2 footprint reduction2

1Assuming a wholesale market diesel price of HK$5.50 (US$0.71 per litre).

Contexto

Further information about this project will be available soon. Please check back for updates.

saiba mais

Desafio

saiba mais

A Solução

saiba mais

O Resultado

Baixar Estudo de Caso

Descubra como os nossos Enertainers podem aumentar a eficiência, protegendo o meio ambiente e reduzindo custos.

DOWNLOAD

"The Enertainer has been excellent for productivity at our site, as it requires virtually no user operation, recharges itself automatically, and has required no maintenance. Additionally, the data provided by the Enertainer has given us new insights into the operations at our site. We are looking forward to new developments of Ampd's data platform and how these can be used to further enhance site operations in the future."

Dennis Lee
Senior Project Manager, Kai Tak West Project, Gammon Construction